Production Settings, Machines with their rate per hour, Expense Types, and who may see labour cost.

Set these up once, in this order, before the first production entry: access rights, Production Settings, Machines, Expense Types. Finished items need a bill of materials; it fills the materials of each production entry.

1. Access rights

Ask your administrator to grant the Production screens to the user groups that need them, in Access Rights: Job Orders, Item Assembling, Machines, Expense Types, Production Settings, Expense Distribution and Production Reports. Users log out and in again to see them.

Who may see labour cost

Labour cost reveals what people are paid, so it is shown only to user groups that have the Labour Cost screen. Ask your administrator to tick Labour Cost → Visible in Access Rights for those groups (for example, Accounts and the production manager), and to leave it off for the others.

With Labour CostWithout it
Rate and amount of employees and temporary staff on a production entryShown, and the rate can be changedHidden: the rate shows Worked out on save; the cost is worked out when the entry is saved
Outside labour (rate or lump sum)ShownShown
Labour, Book cost, Unit cost, Full cost on the cost summaryShownShown as —
Machine rate on a production entryCan be changedTaken from the machine
Labour hours and cost reportHours, average rate and amountHours only, with the note Labour cost hidden: you have no right to see it
The Labour Cost screenIn the menuNot in the menu

The Labour Cost screen

Menu: Production → Labour Cost. A read-only list of employees or temporary staff (switch with the buttons) with their Monthly pay and Rate / hr. Monthly pay is the earnings HR Setup pays as additions: the basic salary and the fixed allowances. Rate per hour = monthly pay ÷ the standard hours per month in Production Settings.

Labour Cost
Rate per hour = monthly pay (the earnings HR Setup pays) / the standard hours per month in Production Settings. Only groups with this screen in Access Rights see labour cost.
EmployeeTemporary staff
 
CodeNameMonthly payRate / hr
EMP01Ahmed Salem4,800.0023.0769
EMP02Ravi Kumar3,120.0015.0000

Labour Cost: 4,800 a month ÷ 208 hours = 23.0769 per hour

2. Production Settings

Menu: Production → Production Settings. One form for the whole company.

FieldMeaning
Labour absorbed accountCredited with the labour of employees and temporary staff when a production entry is posted. Payroll debits the salary expense as usual; this account takes back the part that went into stock.
Outside labour accountCredited with outside labour (contractors, day labourers). Empty: the labour absorbed account is used.
Machine absorbed accountCredited with machine cost, unless the machine has its own account.
Cost of sales account (fallback)Used by Expense Distribution when an item has no cost of sales account of its own.
Standard hours per month *The hours an employee's monthly pay covers (more than 0, at most 744; 208 when first opened). Rate per hour = monthly pay ÷ these hours.
Production Settings Save
Accounts
When a production entry is posted, its labour and machine cost are credited to these accounts. The cost of sales account is used when an item has none of its own.
5150 · Labour absorbed
5155 · Outside labour absorbed
5160 · Machine cost absorbed
5001 · Cost of goods sold
Labour
An employee's rate per hour is their monthly cost divided by these hours, e.g. 4,800 / 208 = 23.08.
208

Production Settings: four accounts and the standard hours

Important: once production entries are posted with a voucher, the labour absorbed account (and the outside labour and machine accounts, when those costs are used) must be set, or posting is refused, e.g. Set the labour absorbed account in Production Settings. The accounts lists show the posting accounts of your company.

3. Machines

Menu: Production → Machines. A machine (work centre) is anything whose time you want to charge to production: a filler, an oven, a press, a whole line. Each has a rate per hour; a production entry charges hours × rate.

  1. Click Add Machine.
  2. Machine: Code (letters, digits, - and _), Name, Arabic Name, Branch, Production line, Active.
  3. Cost per hour: choose the Fixed asset the machine is (only assets still held are listed, not disposed or sold ones), the Planned hours per month (176 when first opened: 22 days × 8 hours), and any Other cost per hour such as maintenance. Or type a Typed rate per hour, e.g. for a leased machine.
  4. Electricity (optional, used by Add electricity on a production entry): Power (kW), Tariff per kWh, Has its own meter, Electricity expense account.
  5. Accounts: Machine absorbed account — empty uses the one in Production Settings.
  6. Save.

How the rate per hour is worked out

The Rate per hour panel shows the sum live while you type:

LineExample
Asset value (purchase value + additions − deductions)36,000.00
× depreciation % = yearly depreciation× 10 % = 3,600.00
÷ 12 = monthly300.00
÷ planned hours = depreciation per hour÷ 176 = 1.7045
+ other cost per hour+ 0.5000
= Rate per hour2.2045

With a Typed rate per hour, the asset lines turn grey and the typed rate is used instead. With no asset and no typed rate, the rate is the other cost per hour.

New Machine CancelSave
Machine
FILLER1
Filler
آلة التعبئة
1001 · Main factory
L1 · Line 1
Active
Cost per hour
FA-0042 · Filling machine
176
0.50
 
Rate per hour
Asset value36,000.00
× 10% = yearly depreciation3,600.00
÷ 12 = monthly300.00
÷ 176 hours = depreciation per hour1.7045
+ other cost per hour0.5000
= Rate per hour2.2045
Electricity
15
0.18
Has its own meter
5210 · Electricity – factory
Accounts
 
Empty: the account in Production Settings is used.

A machine linked to its fixed asset: 2.2045 per hour

Electricity is not in the rate. Power use differs from run to run, so it is added on each production entry with Add electricity (kW × hours × tariff, or the meter readings when the machine has its own meter). Common power bills can also be shared at month end with Expense Distribution.
  • A machine with Has its own meter needs a tariff: A machine with a meter needs the electricity tariff.
  • A machine used on production entries can't be deleted; untick Active instead. Inactive machines aren't offered on new entries.
  • Changing the rate later doesn't change entries already saved: each machine line keeps the rate it was given when it was added.

4. Expense Types

Menu: Production → Expense Types. An expense type is a period expense you want to share over production at month end: factory rent, power, maintenance, admin, branding…

  1. Click Add Expense Type.
  2. Enter Code, Name and Arabic Name.
  3. Choose the Default basis — how the bill is shared between production entries (table below).
  4. Choose the Default treatment: Add to stock cost or Report only.
  5. Tick Admin or selling cost for admin, marketing, branding and other non-production costs.
  6. Under Accounts, click Add Account for each expense account the type collects. A distribution reads the period's bill from these accounts.
  7. Save.
BasisShares the bill byGood for
Output quantityQuantity produced by each entrySimilar products
Machine hoursMachine hours on each entryFactory rent, power, maintenance
Labour hoursLabour hours on each entrySupervision, canteen
Material valueValue of materials usedStorage, handling
Production costBook cost of each entryGeneral overheads
Typed shareAmounts you type per entrySpecial cases
New Expense Type CancelSave
Expense type
BRAND
Branding
العلامة التجارية
Output quantity
Add to stock cost
Admin or selling cost
Active
Under IAS 2, admin and selling costs (e.g. branding, marketing) can't be included in stock value.
Accounts The expense accounts this type collects: an expense distribution reads the period's bill from them.+ Add Account
Account
6310 · Branding and advertising🗑

An admin / selling cost set to Add to stock cost: the IAS 2 note turns into a warning

The IAS 2 note

The note Under IAS 2, admin and selling costs (e.g. branding, marketing) can't be included in stock value. is always shown under the fields, in blue. When Admin or selling cost is ticked and Add to stock cost chosen, it turns amber as a warning. Saving is still allowed — the company's accountant decides — but the usual choice for such costs is Report only.

ExpenseSuggested treatmentWhy
Factory rent, factory power, machine maintenanceAdd to stock costProduction overheads belong in the stock value
Head office admin, branding, marketingReport onlyNot production costs: they stay expenses of the period, and appear in full cost only
  • At least one account is needed: Choose at least one account. The same account added twice is kept once.
  • An expense type used on expense distributions can't be deleted; untick Active instead.
Video coming soon

Set up production costing

This video will show: who may see labour cost, Production Settings, a machine with its rate per hour from the fixed asset, and expense types with the IAS 2 note.

Need more help with production costing?

Contact the Bizmagnet ERP support team or explore other guides.

← Back to Production
production-setup | BizMagnet ERP