Production: Worked Example

One month of production from sales order to full cost per unit, with every number worked out.

Repair kits: from sales order to full cost per unit

Goal: a customer orders 100 repair kits (KIT-1). Each kit is 2 × PART-A + 1 × PART-B. We make them on the filler machine with one employee and a contractor, add the month's factory rent and branding, and find what one kit really cost.

The data

WhatValue
KIT-1 bill of materialsPART-A 2, PART-B 1 per kit
PricesPART-A 5.00, PART-B 2.00
Machine FILLERTyped rate 20.00 per hour; 15 kW; tariff 0.18 per kWh; electricity account 5210
Employee EMP01Monthly pay 4,800; standard hours per month 208 → 23.0769 per hour
Outside labourContractor A, lump sum 150.00
Production SettingsLabour absorbed 5150, Outside labour 5155, Machine absorbed 5160, cost of sales 5001
Expense type RENTAdd to stock cost, basis Output quantity, account 5201 Factory rent (October: 1,200)
Expense type BRANDReport only, basis Output quantity, Admin or selling cost; 9,600 a year
Also in OctoberEntry ASM-0052: 300 × KIT-2, book cost 1,500.00 (5.00 each), including an expense line of 200 on 5201

The steps

#ScreenActionResult
1Sales Order screenCustomer Al Waha Trading orders KIT-1 × 100SO-123
2Production → Job OrdersAdd Job Order → Sales Order SO-123 → SaveJOB-0001: KIT-1 ordered 100, Not started
3Job OrdersProduce on KIT-1Item Assembling with JOB-0001, KIT-1, Output Qty 100; materials PART-A 200, PART-B 100
4Item Assembling, headerMachine FILLER; Start 14/10 08:00, End 15:30Duration 7.5; Machines tab: FILLER 7.5 h × 20.00 = 150.00
5Materials tabCheck the quantities usedPART-A 200 × 5 = 1,000.00; PART-B 100 × 2 = 200.00; total 1,200.00
6Labour tabEmployee EMP01, 7.5 h; Outside Contractor A, Lump sum 150173.08 + 150.00 = 323.08
7Expenses tabAdd electricity → FILLER, 7.5 h → Add15 × 7.5 = 112.50 kWh × 0.18 = 20.25 on 5210
8Cost summary tabCheck, then SaveBook cost 1,693.33; unit cost 16.93
9Transactions → Batch AllocationItem assembling → the entry → Post with batchesStock: PART-A −200, PART-B −100, KIT-1 +100 at 16.9333; voucher below
10Job OrdersOpen JOB-0001Produced 100, Remaining 0, Completed
11Sales40 kits are sold during OctoberKIT-1 on hand: 60
12Production → Expense DistributionRENT, 01/10–31/10 → Load targets → ApplyBill 1,200, charged 200, to distribute 1,000: KIT-1 250 (150 to stock, 100 to cost of sales), KIT-2 750
13Expense DistributionBRAND, 01/10–31/10, To distribute 800 → Load targets → ApplyKIT-1 200, KIT-2 600; nothing posted
14Production Reports → Production cost sheetOctober → ShowKIT-1: book unit cost 16.93, full unit cost 21.43

Step 6: the labour rate

4,800 ÷ 208 = 23.0769 per hour. 7.5 hours × 23.0769 = 173.08. A user without the Labour Cost right sees Worked out on save instead of the rate, and the same 173.08 is saved.

Step 8: book cost

MaterialsLabourMachinesExpensesBook cost÷ 100 = unit cost
1,200.00323.08150.0020.251,693.3316.93

Step 9: the posting voucher

Dr / CrAccountAmount
DrKIT-1 inventory1,693.33
CrPART-A inventory1,000.00
CrPART-B inventory200.00
Cr5210 Electricity – factory20.25
Cr5150 Labour absorbed173.08
Cr5155 Outside labour absorbed150.00
Cr5160 Machine cost absorbed150.00

KIT-1 had no stock before, so its cost price becomes 1,693.33 ÷ 100 = 16.9333.

Step 12: October rent

Shares by output: KIT-1 100 of 400 = 25 % = 250.00; KIT-2 75 % = 750.00. KIT-1: 60 of the 100 made are still on hand, so 250 × 60 ÷ 100 = 150.00 to stock and 100.00 to cost of sales. KIT-2: all 750.00 to stock.

Dr / CrAccountAmount
DrInventory (KIT-1)150.00
Dr5001 Cost of goods sold (KIT-1)100.00
DrInventory (KIT-2)750.00
Cr5201 Factory rent1,000.00

Cost prices: KIT-1 16.9333 + 150 ÷ 60 = 19.4333; KIT-2 5.0000 + 750 ÷ 300 = 7.5000.

Step 14: what one kit cost

TotalPer kit
Book cost (materials, labour, machine, electricity)1,693.3316.93
+ Factory rent (added to stock cost)250.002.50
+ Branding (report only)200.002.00
Full cost2,143.3321.43
What this tells you: the 60 kits in stock are valued at 19.4333 each — production costs only, as IAS 2 requires. To make money on every kit, price above 21.43, which also covers its share of branding.
Video coming soon

Repair kits, end to end

This video will show: the whole example above in one continuous recording, from the sales order to the full cost per kit.

Need more help with production costing?

Contact the Bizmagnet ERP support team or explore other guides.

← Back to Production
production-worked-example | BizMagnet ERP